← All workouts Strength program

5/3/1 — base cycle

Four weeks as one cycle: three loading weeks with rising intensity (5s, 3s, 5/3/1 — the last set of each is an AMRAP with a minimum target), then a deload week. Every weight is derived from your training max, 90 % of your 1RM. Four days per week, one main lift each: overhead press, deadlift, bench press, squat.

Level
Intermediate
Goal
Strength
Days per week
4
Cycle
4 weeks, repeating
Training max
90 % of 1RM

Main sets per week (percent of training max)

WeekSets
Week 1 — 5s65 % × 5 · 75 % × 5 · 85 % × 5+
Week 2 — 3s70 % × 3 · 80 % × 3 · 90 % × 3+
Week 3 — 5/3/175 % × 5 · 85 % × 3 · 95 % × 1+
Week 4 — deload40 % × 5 · 50 % × 5 · 60 % × 5 (no AMRAP)
Warm-up (every day)40 % × 5 · 50 % × 5 · 60 % × 3

Progression

After each cycle the training max goes up: +2.5 kg for upper-body lifts, +5 kg for lower-body lifts. Kadence proposes the new training max and lets you edit it.

After the 5/3/1 method published by Jim Wendler

5/3/1 — base cycle in Kadence

Enter your maxes once; Kadence calculates every set of every session, shows "today" with warm-ups and working sets, logs each set with one tap and applies the progression — including deloads — for you. Substitutions are built in for every main lift.

Strength log and programs in detail →

Download on the App Store Coming October 2026 to Google Play

More programs and WODs →